West Red Lake Golds Rowan PEA Projects Average Annual Production of 35000 ounces at 8 grams per tonne AISC of US$1408 per ounce
The Rowan Project is 80 kilometers by road from the operating Madsen Mine and mill. Rowan is a high-grade, relatively wide, nearly vertical deposit that starts at surface. The PEA projects a US$1,408/oz all-in sustaining cost (AISC).
Vancouver, BC, July 10, 2025 – Global Stocks News – Sponsored content disseminated on behalf of West Red Lake Gold. On July 8, 2025, West Red Lake Gold Mines (TSXV: WRLG) (OTCQB: WRLGF) published the results of a Preliminary Economic Assessment (PEA) at its 100%-owned Rowan project in the Red Lake Gold District of northwestern Ontario, Canada.
The Rowan Project is 80 kilometers by road from the operating Madsen Mine and mill.
“Rowan is a high-grade, relatively wide, nearly vertical deposit that starts at surface, and this PEA captures how such designed-for-m...
